Northwood Hall Farm – Future Energy

A 70kw chip boiler has been installed into a newly built shed. This supplies heat to the main house, a converted barn and office. A new 28 radiator system was fitted in the main house that included 2 separate heating zones for ground and upper floors. A 10 radiator system was installed in the converted barn and new systems to the offices.

Mr Curren
Northwood Hall Farm, Ellesmere.